STEAM AND CONDENSATE AUDIT
Project N°30275
Date: 04/02/2011
GSK MANUFACTURING Aranda, Spain
Page 5 of 45
Established by E. Morin
To the attention of Ms. Beatriz Herrero-Gonzalo
In order to identify steam leaks, operational problems etc., a steam trap survey was carried out ; in
total 98 traps were tested. The trap survey showed 15% of failed traps (leaking and plugged).
The savings calculated for optimization projects in this report were based upon engineering
assumptions, observations and standard engineering practices.
We estimate the potential energy savings of at least 9% of the estimated steam budget, which
represents a yearly saving of about 377 MWh, 72 tons of CO2 and 11 850 € (see projects 1-3-4).