Clayton Armstrong 2011-02-22 GSK Aranda SP - steam&condensat
STEAM AND CONDENSATE AUDIT
Project N°30275
Date: 04/02/2011
GSK MANUFACTURING Aranda, Spain
Page 34 of 45
Established by E. Morin
To the attention of Ms. Beatriz Herrero-Gonzalo
STEAM DISTRIBUTION
External leaks of steam or condensate
OK
No leak has been observed during the audit
from pipes, flanges, etc.
System design, trapping points etc.
To be improved Steam lines have all been interconnected to
distribute steam in both ways (from and to Eagle).
Steam line between Eagle and tunnels 1 and 2 is
undersized for high steam demands.
It misses many trapping points in front of control
valves and in “low points”.
Insulation
To be improved Refer to optimization project n°3
Steam quality
To be improved Steam quality is good at the outlet of the boiler
house but is progressively decreased by the lack of
drip legs in front of steam users
Steam pressure level
To be improved There are many pressure reducing stations. The
pressure level is not always adapted to the steam
usage.
Water hammering
OK
No water hammering has been observed in the
distribution lines
STEAM USERS
Condensate drainage and air venting
OK
from heat exchangers
Steam traps
To be improved 15% failed traps identified
Some traps are wrongly mounted (inclined,
reversed)
CONDENSATE AND FLASH STEAM RECOVERY
Condensate recovered
OK
Sizing of condensate return lines
OK
Flash steam recovery
To be improved Flash steam could be recovered on condensate
receivers. A vent condenser exists in tunnel 2 but is
not used anymore.
Water hammering
OK