4.3 Savings calculation
Considering our observations and measurement on site, we can estimate the cost of this flash
steam loss:
Fuel savings
Existing
% of revaporisation (7 to 0 barg)
13,5%
Flash steam flow estimated
ton/h
0,066
safety factor
10%
Energy loss
kW
37
operating hours
hr
6240
yearly Energy used
MWh/year
232
boiler efficiency
%
86
Fuel used
MWh/year hhv
300
Fuel unit costs
€/MWh hhv
25
Fuel costs
€/year
7506
CO2 savings
Existing
Energy used
Gj/yr
1081
CO2 emissions
kg CO2/GJ
50,6