Check Completed SE Kit Installation a. Start and fill the heating unit without burner operation. See the filling proce- dure in Section IV of the Steam Generator/Fluid Heater Instruction Manual. b. Check for leakage around connections of the newly installed SE Kit piping. c. Boil out SE coil using soft water. See the “Conditioning of New Installations” procedure in Section III of the Steam Generator/Fluid Heater Instruction Man- ual. The machine should be ready to be placed into regular operation at this point.
NOTE Some parameters of the control system may require adjustment with the added SE Kit. Consult your Clayton Service Representative for further details.