Clayton Armstrong 2011-02-22 GSK Aranda SP - steam&condensat

STEAM AND CONDENSATE AUDIT

Project N°30275

Date: 04/02/2011

GSK MANUFACTURING Aranda, Spain

Page 26 of 45

Established by E. Morin

To the attention of Ms. Beatriz Herrero-Gonzalo

CO2 produced

t/yr

42

Water savings

Existing

Steam losses

kg/h

50,450

Yearly water lost

m³/year

315

Water unit costs

€/m3

5,0

Water costs

€/yr

1574

Total savings would be 7350 €/year .

6.4 Investment

The budgetary cost for replacing all failing traps is 8000 €.

Including:

- Equipments supply (traps)

- Installation by a mechanical contractor

- Project management

Payback time for replacing all failing traps, including blocked traps, is 13 Months .