Clayton Armstrong 2011-02-22 GSK Aranda SP - steam&condensat

STEAM AND CONDENSATE AUDIT

Project N°30275

Date: 04/02/2011

GSK MANUFACTURING Aranda, Spain

Page 14 of 45

Established by E. Morin

To the attention of Ms. Beatriz Herrero-Gonzalo

This configuration allows maximizing the heat usage and insures a good homogenization of

feedwater temperature in the tank.

However in the new boilerhouse, condensate is connected to the top of the feedwater tank :

Consequently, flash steam generated is not completely condensed and is evacuated through the

vent to the atmosphere.

Made with FlippingBook Digital Publishing Software