R020932J1, Install Manual
Appendix A
Lifting Instructions (See Fig. 1 above.) 1. Use appropriate-sized forklift truck for lifting and moving a SigmaFire Steam Generator /Fluid Heater. 2. Lift unit from heating coil side. 3. Insert forklift prongs in the lifting slots in the frame of the unit.
CAUTION DO NOT lift from any other part of the unit except from the lifting slots!
4. Maintain a minimum clearance of six inches between the forklift and any com- ponent of the unit.
A-3
04/22/2015
Appndx_LiftInstru_SF_d.fm
Made with FlippingBook Ebook Creator