R020932J1, Install Manual
First page
Table of contents
Next page
Last page
Cover
1
Title Page
3
Table of Contents
5
Section I - Introduction
9
Section II - General Information
11
2.1 Location
11
2.2 Positioning and Anchoring Equipment
12
2.2.1 General Installation Requirements
12
2.2.2 Equipment Anchoring
13
2.2.3 Grouting
13
2.2.4 Clayton PD Feedwater Pump Placement
14
2.3 Combustion Air
14
2.4 Customer Connections - Steam Generator
14
2.5 Exhaust Stack Installation
15
2.5.1 Installing Exhaust Stacks
15
2.5.2 Installing Exhaust Stacks With External Condensing Economizer
21
2.6 Piping
23
2.6.1 General
23
2.6.2 Systems
23
2.6.3 Atmospheric Test Valve
25
2.6.4 Steam Header and Steam Sample Points
25
2.7 Feedwater Treatment
25
2.7.1 Water Softeners
26
2.7.2 Make-up Water Line Sizing
26
2.8 Feedwater Supply Requirements
27
2.8.1 Multi-unit Systems
27
2.8.2 Velocity Requirements and Calculation
28
2.8.3 Acceleration Head (Ha) Requirements
31
2.9 Flexible Feedwater Hose Connection And Connection Sizing
32
2.9.1 Supply Side Connections
32
2.9.2 Discharge Side Connections
32
2.10 Pump Suction and Discharge Piping System Design
32
2.10.1 General Layout Guidelines
32
2.10.2 Pipe Sizing Guidelines
33
2.11 Net Positive Suction Head (NPSH)
34
2.11.1 NPSHA
35
2.11.2 NPSHR
35
2.11.3 Acceleration Head (Ha)
36
2.12 General Installation Concerns
38
2.12.1 Charge Pumps
38
2.12.2 Charge Pumps Are Not A Substitute
38
2.12.3 Multiple Pump Hookup
38
2.12.4 Pumphead Cooling Water System (Clayton Feedwater Pumps)
38
2.13 Electrical
38
2.14 Electrical Grounding
39
Section III - Clayton Feedwater Systems
41
3.1 General
41
3.2 Skid Packages
41
3.3 Customer Connections
42
3.4 Open System
43
3.5 Deaerator (DA)
45
3.6 Semi-closed Receiver (SCR)
47
3.7 SCR Skids
48
3.8 Head Tank
48
Section IV - Fuel System
49
4.1 General
49
4.2 Natural Gas
49
4.3 Oil
50
4.3.1 General
50
4.3.2 Light Oil
50
Section V - Trap Separators
51
5.1 General
51
5.2 Operation
51
5.3 Installation
52
5.3.1 General
52
5.3.2 Trap Separator Vent
52
5.3.3 Feedwater Receiver Supply Lines
52
Section VI - Technical Specifications
57
6.1 General
57
6.2 Agency Approvals
57
6.3 Construction Materials
57
6.4 Flame Safeguard
57
6.5 Safety Controls
58
6.5.1 Temperature Control Devices
58
6.5.2 Regulator Approvals
58
6.5.3 Steam Limit Pressure Switch
58
6.5.4 Combustion Air Pressure Switch
58
6.5.5 Pressure Atomizing Oil Nozzles
58
6.5.6 Pump Oil Level Switch
58
6.5.7 Overcurrent Protection
58
6.6 Equipment Specifications
58
6.6.1 Modulating and step-fired SigmaFire steam generators/fluid heaters.
58
6.6.2 Table 6-1a and 6-1b Supplemental Information
60
6.7 Equipment Layout And Dimensions
60
6.7.1 SigmaFire Steam Generators – Step-fired and Modulating
61
6.7.2 Blowdown Tanks
72
Section VII - Optional Equipment
73
7.1 Booster Pump(s)
73
7.2 Blowdown System
73
7.2.1 Blowdown Tank
73
7.2.2 Automatic TDS Controller
74
7.2.3 Continuous Blowdown Valve
74
7.3 Valve Option Kit
74
7.4 Soot Blower Assembly
74
7.5 Pressure Regulating Valves (BPR / PRV)
74
7.5.1 Back Pressure Regulators
74
7.5.2 Pressure Regulating Valves
75
Supplement I - SCR
77
1.1 Semi-Closed Receiver Systems (SCR)
77
1.1.1 Requirements
77
1.1.2 Components of an SCR System refer to Drawing R-16596
77
1.1.3 Water Level Gauge Glass
77
1.1.4 Steam Trap
77
1.1.5 Vent
78
1.1.6 Level Control
78
1.1.7 Steam Relief Valve
78
1.1.8 Sparger Tube
78
1.1.9 Back Pressure Regulator
78
1.1.10 Pressure Reducing Valve
78
1.1.11 Make-up Tank
79
1.1.12 SCR Transfer Pump
79
1.1.13 Chemical Treatment
79
1.1.14 Hook-up
79
1.1.15 System Steam Traps
80
1.1.16 A General Statement
80
Supplement II - Fluid Heater
81
2.1 Fluid Heaters
81
Appendix A - Steam Generator Lifting Instructions
83
Appendix B - Saturated Steam P-T Table
87
Appendix C - Piping and Instrumentation Diagrams
89
Appendix D - Installing SE Option
107
Back Cover
114
Made with FlippingBook
Ebook Creator