Clayton Feedwater Treatment Manual
STEAM GENERATOR WATER SYSTEM Condition Control and Monitoring
Statement Of Operation Water treatement is required with any boiler or steam generator to protect against corrosion and scaling. Due to the compact design of the Clayton steam generator, the water must be continuously treated and regularly monitored. Daily testing and logging is required to assure normal operation of all feedwater system components. The automatic operation of the total system makes the care and effort required minimal. Departure from specific Clayton guidelines may cause rapid and expensive damage. Such damage is NOT covered by warranty. In case of any questions, contact a Clayton Factory Service representative .
See Note 2
COIL FEEDWATER AT SAMPLE VALVE
Limi t Values:
Typical Values:
Hardness – 4 ppm maximum
0 ppm
pH
10.5 – 12.5
Residual Sul f i te
50 – 100 ppm (dur ing operat ion) > 100 ppm (dur ing wet lay-up)
Limi t dissolved sol ids – 8,550 ppm maximum Free of suspended sol ids (mud, rust part icles, etc.)
*3,000 – 6,000 ppm
0
NOTES: 1. Used on dry chemical applications only. 2. Booster pump(s) required if hotwell cannot be elevated high enough to provide required NPSH to the feedwater pump. * The Total Dissolved Solids (TDS) blowdown is to be adjusted to maintain the desired concentration range of dissolved solids.
iii
StatementOfOp_b.fm
04/12/2013